|
Section 4 Interior
98. To insure a consistent reveal where should the shims be placed when installing an interior door frame? A. At the top, bottom and centre on both sides. B. Behind each hinge and top, bottom and centre on strike side. C. Between head jamb and lintel and centre and bottom of side jambs. D. Behind each hinge and behind strike and opposite hinges on the strike side. 99. What is required when a fire exit door is required leaving a stairwell? A. Panic hardware and a door light with Georgian wired glass. B. Panic hardware a door closer and a rated door. C. Panic hardware, a door closer and a rated door and frame. D. Ball bearing hinges and a door closer. 100. What adjustment must be made when closing a casement window, if the lock mechanism will not close fully (too tight)? A. Moving the locking arm in towards the window. B. Moving the latch up. C. Moving the latch down. D. Moving the latch in. 101. What is the first procedure when installing a steel door frame in a masonry wall? A. Plumb the jamb on the hinge side. B. Level the head jamb. C. Fasten the jamb to the floor. D. Insert the masonry anchors. 102. When installing panic hardware on a fire exit door at the top of a stairwell, where should it be mounted? A. Inside the stairwell. B. Outside the stairwell. C. With a parallel arm inside the stairwell. D. At the same height as the fire alarm pull. 103. What procedure should be used for constructing a balustrade on a finished stair? A. Cut the handrails, fit the balusters and plumb the newels. B. Cut the handrails, plumb the newels and fit the balusters. C. Plumb the newels, fit the balusters and cut the handrails. D. Plumb the newels, cut the handrails and fit the balusters. 104. A stair using the maximum rise and the minimum run is too long for an existing rough opening. What is the best solution for the problem? A. Increase the riser height to steepen the stair just enough to clear the headroom. B. Decrease the tread size by shortening the nosing just enough to clear the headroom. C. Cut out the header and rebuild the R.O. to suit. D. Install a set of winders. 105. What is the inside spindle spacing if the newel posts are 1 628 mm (5’ 4") apart (in-between) and the spindles are 35 mm (11/16") wide? Metric A. 86.28 mm B. 92.92 mm C. 100.66 mm D. 109.82 mm Imperial A. 3-5/8" B. 4" C. 4¼" D. 4-5/8" 106. What defines the stringer for a circular stair? A. The slope of both stringers are the same. B. The slope of the outside stringer is greater than the slope of the inside stringer. C. The slope and run of both stringers are the same. D. The slope of the inside stringer is greater than the slope of the outside stringer. 107. When building a mortising jig for a 3½" x 3½" butt hinge, what is the length of the cutout? A. 3½" + the difference in diameter of the router bit and the guide bushing. B. 3½" + ½ the difference in the diameter of the router bit and the guide bushing. C. 3½" + the diameter of the guide bushing. D. 3½" + ½ the diameter of the guide bushing. 108. What is the best product for a clear-coat finish on an exterior wooden deck rail? A. Spar varnish. B. Shellac. C. Lacquer. D. Waterborne lacquer. 109. The last panel on a wall has to be cut to fit, what is the best way to do this? A. Cut the panel approximately 25 mm (1") wide, tack in place plumb to last panel and set scribing tool to mark 25 mm (1"). B. Cut panel approximately 25 mm (1") wide, tack in place plumb to last panel and set scribing tool to mark exactly the width of the overlap. C. Tack panel in place and scribe to fit wall then trim panel to fit the last panel installed. D. Cut the panel to fit between the wall and the last panel and cover the corner joint with a molding. 110. How are sequence matched paneling installed? A. Will arrive on site numbered in sequence, and must be installed that way. B. Can be installed in any order as long as they are not turned upside down. C. Must be placed on the long walls first in order to maintain the pattern. D. Can only be used on walls that have no doors or windows. End of practice. |