|
Section 3
FRAMING
78. If the top of a window is 400 mm (16") below the soffit and the roof overhang is 600 mm (24"). How is the window weather proofed? A. Install a double layer of building paper at the top of the window. B. Use a peel & stick membrane around the window. C. Install a flashing under the moisture barrier at the top of the window. D. Install moisture barrier over nailing fin at the top of the window. 79. When installing a window, where should the sill shims be placed? A. At the V points of the sill. B. Directly in line with the jambs. C. At the ¼ points of the sill. D. Temporarily until window is securely fastened in place and then removed. 80. When gaining hinges with a router template how should the template be placed? A. Equal distance down on door and jamb. B. 3 mm (1/8") lower on door than on jamb. C. 3 mm (1/8") lower on jamb than door. D. 3 mm (1/8") higher on jamb than door 81. When installing a bi-fold door, what adjustments must be made if the door is binding at the side jamb on the top? A. Adjust the top pivot. B. Adjust the bottom pivot. C. Bevel the edge of the door. D. Shim the jamb and adjust door trim. 82. What is required before installing asphalt shingles to a roof? A. Install eave protection. B. Install roof edge. C. Install first row of shingles. D. Install roof vents. 83. When a chimney on a sloped roof is more than 750 mm (30") wide, what must be done to protect the roof from the build-up of snow at the junction? A. Install a saddle. B. Install flashing at least 150 mm (6") up the chimney. C. Install a flat section of roof behind the chimney. D. Install a membrane flashing up the chimney. 84. What is the minimum ventilation required with openings to the exterior for an insulated roof space? A. 1/200 of the insulated ceiling space. B. 1/300 of the insulated ceiling space. C. 1/400 of the insulated ceiling space. D. 1/500 of the insulated ceiling space. 85. What procedure is used to install asphalt shingles around a masonry chimney? A. Install step flashing, roofing and then counter flashing. B. Install roofing, counter flashing and then step flashing. C. Install step flashing, counter flashing then roofing. D. Install roofing and step flashing alternately and then counter flashing. 86. When attaching angle iron to support a masonry veneer on a four story building how is it fastened to the building structure? A. At the top of grade level foundation wall only. B. At the top of foundation wall and midpoint of the building. C. At the top of foundation wall and every other floor level. D. At the top of foundation wall and at each floor level. 87. What must be done prior to installing vertical vinyl siding to a wall? A. Install horizontal strapping at 600 mm (24") o/c. B. Install horizontal strapping at 1200 mm (48") o/c. C. Install vertical strapping at 400 mm (16") o/c. D. Install vertical strapping at 600 mm (24") o/c. |