|
Section 4 Interior
88. How is a close cornice constructed? A. Cutting rafter tails flush with the building and lapping fascia over sheathing. B. Carrying the sloped soffit line of the gable to the horizontal fascia. C. Continuing the horizontal soffit line to the gable overhang and plumbing up to create a "pork chop". D. Sloping the soffit to match the roof slope and covering the wall to soffit junction with a cornice molding. 89. How should horizontal vinyl siding be at outside corners? A. Mitered at the outside corners. B. Butted into vertical corner posts. C. Installed with vinyl corners allowing room for expansion. D. Butted at the outside corner and covered with a vinyl corner post. 90. What should be done to prevent the build-up of moisture between a rainscreen type cladding and the outside face of the wall? A. Provide drainage holes every 1200 mm (4'). B. Seal continuously to insure no water can get in. C. Provide a secondary drainage plane and weep holes. D. Install vertically so water will run off without penetrating. 91. Where should a frieze board be attached to the exterior of a building? A. Attached above the windows and doors first then down the sides. B. Installed vertically at the corners of the building. C. Installed horizontally at the junction of the wall and soffit. D. Installed horizontally at the junction of the foundation and the framed wall. 92. What is the first procedure before installing vertical solid wood wainscoting? A. Strap wall first then apply vertical members. B. Apply vertical members directly to wall with PL 400 and face nail at every stud. C. Pre-mount the solid wood wainscoting on a piece of plywood and glue to wall in sections. D. Strap the wall horizontally and shim to achieve a flat plane before installing vertical members. 93. For a T-bar ceiling system, how many 600 mm x 1 200mm (2' x 4') ceiling tiles would be required in a room measuring 4 670 mm x 5 800 mm (14' 7" x 18' 4")? A. 38 B. 40 C. 42 D. 44 94. What procedure is used to prevent sound transmission between suites in a multi-family dwelling? A. Install resilient channels between the stud and wall finish and add acoustic insulation. B. By leaving a 1" air space between the exterior sheathing and the wall cladding. C. By using expanded foam to insure that there are no gaps for the sound to pass thru. D. By using a low density gypsum to dampen the sound and add acoustic insulation. 95. What is the proper method of applying baseboard at carpet and linoleum locations when there are two different elevations? A. Scribe baseboard over carpet line. B. Use mitre joints at carpet and linoleum intersection. C. Cut a bevel cut on baseboard over carpet line 24” long. D. Cut carpet back so baseboard is at the same elevation as the linoleum. 96. What must be done before installing resilient flooring? A. Sweep and vacuum sub-floor to insure there is no grit or other bumps that will telegraph thru the finish floor. B. Screw down N" particle board. C. Screw down ¼" fir plywood. D. Nail/staple acceptable underlay material. 97. What substrate is required to install a ceramic tile floor in a bathroom? A. Flood with self leveling cement to insure a smooth, flat surface to work on. B. Install a minimum ½" plywood underlay. C. Install a minimum ½" particle board. D. Install ¼" 'silvaply/ulay' underlay. |